Sanitary drainage project to El Balashon village in Sharkia governorate
Project name : Sanitary drainage project to El Balashon village in Sharkia governorate
Work nature  : -gravity network. -pressure pipeline -sewage treatment plant
Owner            : The general economical organization for potable water and sanitary drainage
Consultants   : Urban studies and design center Dr./ Ahmed Fadel
 
Project Overview
 
Project Completion Actual Value Design Consultant Supervision Financing Source  Owner Project Name NO.
submitted 6'261'785.00 Urban studies and design center Dr./Ahmed Fadel The consultant bureau of civil and environmental engineering The organization of reconstruction and development of the Egyptian villages ORDEV The general economical organization of potable water and sanitary sewage in El Sharkia The integrated sanitary sewage project of El Balashon village - Belbis Center 2
 
 
Project Description :
 
The aim of the project is to achieve an integrated sanitary  work at El Balashon village , Belbys center , the work includes :
 
a-      Gravity network of clay pipes of diameter 8" to 20" and of length 5 km.
b-      A pump station having a sump at the operating room with 3 pumps of discharge 40 L/S each , administrative offices,  workshops , storage building , generator and
         transformer building , security room , office and fence.

c-      A rising main pipeline of length 340m and diameter 315 mm made of plastic P.V.C pipes.
d-      A treatment plant of capacity from 2000m3/day to 6000m3/day.
Its units  :   inlet chamber , screens , distribution chamber , oxidation channels sedimentation tanks , chlorination tanks,  chlore addition reservoirs  ,  bridges , weirs , water pumping station to the filters , sludge thickener , drying beds, administration buildings , workshops & storage buildings.
 
 
Project components :
 
           §Civil Works :
 
 Includes excavation , refilling and sand replacement works , plain and reinforced concrete works , isolation , built , steel works,
 internal plant roads works and sanitary works.
 
           §Mechanical Works :
 
1-      Supply , erection , test and operation of submerged centrifugal pump.
2-      Supply , erection , test and operation of vertical electrical motor.
3-      Supply , erection , test and operation of dewatering submersible pump.
4-      Supply , erection , test and operation of manual monorail capacity not less than 1 ton.
5-      Supply & erection of aspirator, rotating bridge with scraper & weir  plates.
 
           §Electrical Works:
 
1-      For the pump station :
 
a-      supply , erection , test and operation of a transformer 11/0.4 K.V
b-      supply and erection of a ring main unit /11K.V
c-      supply , erection and operation of a power generating set.
d-      Supply , erection and operation of a distributing and main operating panel.
e-      Supply , erection of a Fluores cent lighting unit and a current intake .

 
 
2-      For the treatment plant :
 
a-      connecting the electric current.
b-      Supply, erection, test and operation of a main low tension distribution switch board.
c-      Supply and erection of copper cables & steel lighting poles.