Sanitary drainage treatment plant in Zawiet El karadsa El fayoum
Project name : Sanitary drainage treatment plant in Zawiet El karadsa El fayoum
Work nature  : Civil and electromechanical works of the plant
Owner            : The general economical organization for potable water and sanitary drainage
Consultants   : Urban studies and design center Dr./ Ahmed Fadel
Project Overview
 
Project Completion Actual Value Design Consultant Supervision Financing Source  Owner Project Name NO.
Submitted 3'412'771.0 URBAN Studies and design center (Consulting Engineering) URBAN Studies and design center (Consulting Engineering) The social fund for developing S.F.D. The general economical organization of potable water and sanitary sewage in      El Fayoum The collected sanitary sewage water treatment plant of zawyat El Karadsa Bani Saleh and Manshiat Abd Allah at           El Fayoum 3
 
 
·                 Project Description :
 
 
The project aim is to construct a sewage treatment plant in zawyat El Karadsa at El Fayoum :
 
                         Its discharge = 20000 m3/d and its units are :-
                         The inlet chamber and screens, grit chamber , distribution chamber, Primary sedimentation tanks, Aeration tanks.
                         Finally sedimentation tanks, Chlorination tank, Valves chamber.
                         Administrative buildings, chamber of chlorine cylinders, The exceeding water pump station.
                         The sludge pump station, Thickener, Drying Beds.
 
 
 
 
 
 
 
 
 
 
 
 
·                 Project components :
 
           §Civil Works :
 
                       1) Excavation & refilling works to the different parts of the plant.
                       2) Plain & reinforced concrete works to the plant units.
                       3) Masonry works & finishings.
 
           §Mechanical works :
 
                        1) Supply, erection & operation of  mechanical surface aeriators of power 20 HP.
                        2) Supply, erection of a vertical pump of discharge 50 L/S and manometric head 15 m.
                        3) Supply, erection of a vertical pump of discharge 10 L/S and manometric head 10 m,with the  supply of a main rising pipeline diam. 3" .
                        4) Supply, erection , test & operation of a vertical submersible pump unit of discharge 15 L/S and  manometric head 15 m.
                        5) Supply & erection of a chlore injection system.
                        6) Supply & erection of manual screens , flow control gates & weirs at different places.
                        7) Supply, erection, test & operation of a manual monorail capacity 500 kg.
                        8) Supply, erection of handrails for the reservoirs & ductile cast iron interconnecting pipes.
                        9) Supply & erection of all types of valves and its accessories.
 
           §Electrical works :
 
1) Connecting the electric current to the plant by the supply, erection, test & operation of a voltagetransformer 11/0.4 K.V/3 phase / 4 wires- 400             K.V.A /50 Hz.
2) Supply, erection & operation of an electric diesel generating unit consisting of diesel engine 4 stroke and 3 phase electric generator.
3) Supply, erection and operation of a main low tension distrubution switch board.
4) Supply, erection and operation of a low tension panel for aeriators and pumps and lighting poles &panels for the site general layout.
 