Project Overview
 
Project Completion Actual Value Design Consultant Supervision Financing Source  Owner Project Name NO.
Submitted 19'423'883.00 URBAN Studies and design center Dr./Ahmed Fadel URBAN Studies and design center Dr./Ahmed Fadel The general economical organization for potable water and wastewater  in El Menia The general economical organization for potable water and wastewater  in El Menia Improving and increasing the efficiency of wastewater treatment plant in ElMenia  (Tella) 4
 

·Project Description :
 
The project aim is to improve and increase the efficiency of the sewage treatment plant that includes : the inlet chamber , screens,
sludge thickener , chlorination chamber , anaerobic ponds , drying beds , contact tanks , aeration tanks , water pump station for
the aeration tanks & sludge pump station.
The project works include the restoration of the existing sedimentation tanks.
 
 
·Project components:
 
           §Civil works:
 
1-      Excavation works, coating of walls & floors of unareobic ponds.
2-      Plain and reinforced concrete works , masonry , paintings , isolation & finishing works also works for the treated wastewater pipeline.
 
           §Mechanical works :
 
1-      Supply, erection & test of surface aerators power 15 H.P.
2-      Supply, erection of weirs for the aeration tanks.
3-      Supply erection of vertical sewage pumps of discharge 210 L/S at manometric head 20m.
4-      Supply erection & test of chlorination system.
5-      Supply erection & test of submersible dewatering pumps of discharge 10 L/S & manometric head 10m.
6-      Supply , erection & test of exhaust & supply fans for air suction discharge 1500 ft3/min
7-      Supply, erection & test of an overhead crane capacity 2 ton for pump station , and 3 ton for generator building.
8-      Supply, erection of interconnecting ductile cast iron pipes.
9-      Supply , erection of flow control gates , valves , fire hydrant and submersible sewage pump of discharge 50 L/S and manometric  head 15m.
 
           §Electrical works:
 
1-      Supply , install , test & operation of a transformer koshk cable voltage 12 Kv XLPE .
2-      Supply , install , test & operation of a power generating set , a main low tension distribution switch board for the pump  station , aerators & booster pumps.
3-      Supply, install , test & operation of lighting works.
4-      Supply, install , test & operation of earthing system.
5-      Supply, install , test & operation of a current intake ( 10A - 220V ) & ( 3 PH - 25 A ) & cables .